We have built up a solid reputation in Scotland for our expertise in providing rope access rescue cover and executing complex, high-risk operations that require precision and safety. In the aftermath of severe winter storms, one of our clients based in Dumfries and Galloway faced a critical challenge: substantial debris had accumulated at the mouth of a key bridge, obstructing its functionality and posing significant hazards.
The winter storms had resulted in a significant amount of debris, including large branches and other materials, collecting at the mouth of the bridge. This accumulation threatened the structural integrity of the bridge and impeded its use, necessitating immediate and safe removal. The operation required specialised skills and equipment to ensure the safety of all personnel involved, particularly given the hazardous conditions created by the debris and the surrounding environment.
Abseiling Services was engaged to provide comprehensive rescue cover and facilitate the debris removal process. The solution involved both manual and mechanical efforts, underpinned by robust safety measures.
Our rope access team established a rig-to-rescue system. This system ensures that the operative performing the debris removal was continuously attached to a rescue rig, allowing for immediate extraction in case of an emergency. This setup is crucial for high-risk operations, providing a safety net that guarantees the operative’s safety at all times.
Our rope access team were tasked with cutting large branches and other obstructions into manageable pieces. Using a chainsaw, the work required precision and strength, as well as the ability to work safely while suspended.
In addition to the manual removal, heavy machinery was employed to pull out the larger, heavier debris pieces that could not be handled manually. This combination of manual and mechanical methods ensured that all debris, regardless of size or weight, was effectively cleared from the bridge mouth safely.
The operation was executed in the following steps:
The project was completed successfully, with all accumulated debris safely and efficiently removed from the mouth of the bridge, restoring its functionality and safety.
Thanks to the rig-to-rescue system and meticulous planning, the operation was carried out without any safety incidents or emergencies. Our client was highly satisfied with the prompt and professional handling of the debris removal, commending the safety measures and efficiency of our team.
This project yet again highlighted our capability in handling high-risk operations with precision and safety. The successful removal of debris from the bridge mouth under challenging conditions showcases our commitment to safety, expertise, and client satisfaction. Our rig-to-rescue system and skilled operatives ensure that even the most hazardous tasks are completed without compromising safety, setting a benchmark for rescue cover and abseiling operations in the industry.
If you would like to know more about our rope access rescue cover please click here.
For more information on this project or to discuss your specific rope access needs, please contact us today.
WE OFFER FREE ESTIMATES AND ALWAYS QUOTE THE BEST POSSIBLE PRICE